Pillar 01 / Consult

Thermal consultancy

Understand the heat load before choosing the hardware. We assess direct-to-chip cooling and rear-door heat exchangers against your rack layout, GPU platform, and facility conditions.

Cooling design and thermal planning schematic

Feasibility study

Assess cooling options, retrofit constraints, energy use, and operating costs.

Technology selection

Compare direct-to-chip cooling and rear-door heat exchangers for your workload.

Thermal sizing

Size CDUs and loops from rack heat loads, coolant temperatures, flow, and pressure drop.

Design & site review

Review MEP interfaces, heat rejection, redundancy, and readiness before build-out.

Pillar 02 / Supply

Supply

Cold plates, CDUs, manifolds, and rear-door heat exchangers. We match equipment to the server platform, thermal design, and project delivery requirements.

Cooling components warehouse and delivery schematic

Direct-to-chip equipment

Cold plates, CDUs, manifolds, and connections matched to the GPU platform.

Rear-door heat exchangers

Rack-level heat removal for existing air-cooled servers and retrofit projects.

Procurement & delivery

OEM selection, technical submittals, lead times, logistics, and warranty coordination.

NVIDIA-qualified sourcing

For NVIDIA platforms, we prioritise cooling products with documented NVIDIA qualification for the specific model and application.

Worldwide deployment references

We prioritise supplying OEMs with documented projects worldwide, relevant installation references, and established support.

See the full product list.

Direct-to-chip components, CDUs, manifolds, and rear-door heat exchangers.

Browse products
Pillar 03 / Integrate

System integration

From purchase order to go-live. Install, fill, commission, and hand over a working loop.

Cooling system installation and commissioning schematic

Site coordination

Coordinate OEM, MEP, and IT interfaces before installation.

Installation

CDUs, manifolds, piping, and rack connections.

Fluid fill & test

Coolant fill, flushing, pressure testing, and leak checks.

Commissioning

Flow balancing, controls tuning, and thermal acceptance testing against the agreed design.

Support

SLA cover and scheduled maintenance.

How we work

Six steps to a commissioned loop.

01

Assess

Site, load, climate, budget.

02

Design

Technology choice and sizing.

03

Procure

Sourcing and staging.

04

Integrate

Install and fluid fill.

05

Commission

Balance and test.

06

Support

SLA and maintenance.

Get in touch early

The cooling decision drives everything else.

Rack layout, power, and building design all depend on it. Talk to us before you commit.